Reporter |
![]() |
---|---|
Created | Feb 18, 2013 3:13:35 PM |
Updated | Jun 11, 2013 9:16:14 PM |
Resolved | Feb 26, 2013 9:55:05 PM |
Priority | Normal |
Type | Usability Problem |
State | Fixed |
Assignee | Dmitry Krasilschikov (dima) |
Subsystem | Workflow |
Fix versions | Gentle |
Fixed in builds | No Fixed in build |
Affected versions | No Affected versions |
Browser | Any Browser |
OS | Any OS |
Verified in build | Not verified |
Verified by | Nobody |
Reviewed by | No reviewed by |
Severity | Routine |
Hi,
We have certain deliverables that have a specific dead-line within a sprint. Since these are mostly documents produced during, I was trying to add them to the development sprint.
What I needed was something like:
Is this somehow possible already? If not, does this fit as a new requirement for YouTrack?
Thanks for this nice product
We have certain deliverables that have a specific dead-line within a sprint. Since these are mostly documents produced during, I was trying to add them to the development sprint.
What I needed was something like:
- Create the issue
- Assign the issue to someone
- Estimate the task
- Define the dead line
- At (deadline - estimation) send a notification to the assigned person to stop developments and take care of this task
Is this somehow possible already? If not, does this fit as a new requirement for YouTrack?
Thanks for this nice product